CONSTRUCTION:-Top border of 16 gauge s.s.sheet,with 150mm high s.s.sheet proper welding,gauge,back of the back splash to be fully closed with 16 gauge s.s.sheet with proper welding,provided with 1 nos.H.P.L.P.G/P.N.G (1,00,000 btu each),under shelf of 25mm dia.s.s.pipe to be provided, burner provided with needle control valve and pilot lamps,with 38mm dia.s.s.pipe legs,with nylon bullet adjustable feet.